banner
Zhangjiagang HDPE PE PPR LDPE Gas Water Pipe Supply Drainage Electric Conduit Pipe Hose Tube Production Single Wall Corrugated Pipe Extrusion Making Machine

Zhangjiagang HDPE PE PPR LDPE Gas Water Pipe Supply Drainage Electric Conduit Pipe Hose Tube Production Single Wall Corrugated Pipe Extrusion Making Machine

Overview Product Description HDPE Single Screw Extruder, with different die head, and downstream machines, which can pro
SHARE

Description

Basic Info
Type Pipe Extruder
Plastic Processed PE
Product Type Extrusion Molding Machine
Feeding Mode One Feed
Assembly Structure Integral Type Extruder
Screw Single-Screw
Engagement System Full Intermeshing
Screw Channel Structure Deep Screw
Exhaust Don′t Exhaust
Automation Automatic
Computerized Computerized
Motor Brand Siemens/Honeywell/Wn
Inverter Brand ABB/Schneider
Delivery Time 75-90 Days
Ld Ratio 33/38/40
Main Extruder 60/75/90
Main Motor Power 11-315kw
Capacity 30-1200kg/Hr
Electrical Parts Schneider/Ls/Siemens/Omron/ABB
Operation Control PLC
PLC Brand Siemens
Design Origin Europe
OEM Avaliable
Agent Needed
Machine Color Customized
Brand Acmtech
Transport Package Strench Film and Wood Pallet
Specification ACM-PE-630
Trademark ACM
Origin China
HS Code 8477800000
Production Capacity 200 Sets
Product Description
Product Description

HDPE Single Screw Extruder, with different die head, and downstream machines, which can produce different size of plastic pipe, diameter ranging from 12mm to 1600mm. SJ series single-screw plastic extruder is for plastic extruder molding equipment, change different type dies (female and male) and match assistant machine, can process soft, hard polyvinyl chloride, polyethylene, polypropylene and etc raw material to pipe, stick, blowing film draw line, blowing bottle and wrap wire, cable, insulation. This machine is special for PE, PP high-speed extruder, suitable for high-speed extruding pipe, sheet and etc product.

 

Zhangjiagang HDPE PE PPR LDPE Gas Water Pipe Supply Drainage Electric Conduit Pipe Hose Tube Production Single Wall Corrugated Pipe Extrusion Making Machine

Zhangjiagang HDPE PE PPR LDPE Gas Water Pipe Supply Drainage Electric Conduit Pipe Hose Tube Production Single Wall Corrugated Pipe Extrusion Making Machine

Zhangjiagang HDPE PE PPR LDPE Gas Water Pipe Supply Drainage Electric Conduit Pipe Hose Tube Production Single Wall Corrugated Pipe Extrusion Making Machine

Zhangjiagang HDPE PE PPR LDPE Gas Water Pipe Supply Drainage Electric Conduit Pipe Hose Tube Production Single Wall Corrugated Pipe Extrusion Making Machine

Product Parameters

Zhangjiagang HDPE PE PPR LDPE Gas Water Pipe Supply Drainage Electric Conduit Pipe Hose Tube Production Single Wall Corrugated Pipe Extrusion Making Machine

CertificationsPackaging & ShippingInstallation InstructionsCompany Profile

Suzhou ACMtech Machinery Co., ltd., is a company, which is specialized on plastic extrusion and recycling machinery manufacturing and trading. ACM has top-ranking Research and Development technology system and rich experienced technician team. The main product scope of ACM is Extrusion and Recycling. Extrusion contains: PO and PVC PIPE, PROFILE, SHEET Extrusion Line. Recycling contains: PET, PE, PP, ABS, PC product washing and recycling. Our vision is to offer you the best and the most appropriate plastic extrusion and recycling solution, to offer you the most reliable technically and commercial service support. WIN-WIN Business, let's shake hands!

Our AdvantagesClient's FactoryExihibition:

AFTER SERVICE
Technical documentation
All symbols on the equipment will be in English. We will be responsible for providing the Buyer with a general layout plan, electrical plan, installation orientation and manuals, in English.
Arrangements for inspection, installation and testing of the equipment
a. After all of the equipment is delivered to the customer's factory, the Buyer shall be responsible for all preparation work, e.g. electricity supply, water supply, cranes and labor, etc.b. We will prepare visa applications for their engineers, who will assist in the equipment installation and testing at the Buyer's factory. c. The Buyer will buy a round-trip air ticket for the engineer(s) after the visa application is approved. The Buyer is responsible for all expenses generated, e.g. visa application fees, meals, accommodation and an allowance of $80.00 per day for each engineer.d. The engineer(s) will provide free training for the operators and maintenance people, in Buyer's factory.e. If the Buyer does not request commissioning by our engineer(s) within four months from the date of the bill of lading, it will be accepted that all the equipment has been successfully tested and approved by the Buyer.
Quantity and quality guarantee
a. In cases of quantity discrepancies or equipment damage, at the destination, the Buyer will file a claim within 30 days after the arrival of the goods at its destination. The insurance company and the shipping company will be responsible for all discrepancies and damage caused by the shipping company or other transportation companies. b. Guarantee period and after-sales services: 13 months from the date of the bill of lading.During this guarantee period, if there is a quality issue, we will provide spare parts without charge. If malfunctions are caused by the Buyer's improper operation of equipment, we will provide the Buyer with spare parts at cost prices. c. Long-term service:Beyond one year, we will provide the Buyer with spare parts at reasonable prices and provide long-term technical guidance.

 

Our Contact